Fortis Siteworks has begun water-line work for the new State Route 53 roundabout at Malcom Bridge Road and Rays Church Road in Oconee County.
Working as a subcontractor to E. R. Snell Contractor Inc., Fortis will relocate more than 1,200 feet of water line to make room for the roadway improvements.
The work includes approximately 455 feet of 8-inch water line and 800 feet of 12-inch water line. Crews will also install protective steel casing beneath portions of the future roadway.
Some of those crossings will be completed using a method known as jack and bore. Instead of cutting an open trench across the road, crews dig pits on each side and use specialized equipment to install steel casing underground.
Fortis’ scope includes approximately 140 feet of jack-and-bore crossings. Two crossings will carry new water line, while another will carry reinforced-concrete drainage pipe through a 30-inch steel casing.
Additional water-system work includes two new fire hydrants, valves, fittings, connections to the existing system and three locations where existing water lines will be cut and plugged.
The larger Georgia Department of Transportation project will replace the existing intersection with a single-lane roundabout and mountable truck apron. The project is intended to reduce the frequency and severity of crashes while improving traffic flow at the intersection.
Moving the existing water lines is an important early step. The utilities must be relocated or protected before construction of the new roundabout can advance.
The project showcases Fortis’ ability to support roadway contractors with water-line relocation and underground crossings while working within an active transportation corridor.