Our Work

Latest updates and projects from the ground up

A Komatsu dozer and tracked excavator clearing and grading a wooded red-clay site, with silt fence installed along the treeline behind them.

Harbor Pointe Townhomes Moves Into Site Development

Site development is underway at Harbor Pointe Townhomes, a 79-unit community on Loch Lomond Drive in Greensboro, where Fortis Siteworks is delivering the full civil package across roughly 15 acres. The scope includes 53,000 cubic yards of earthwork, more than 10,000 linear feet of storm, water and sewer, and 4,750 linear feet of curb and gutter.

read more
Two Fortis Siteworks crew members steady a large precast concrete box culvert section as it is lowered by chain rigging into a creek crossing in a wooded area.

Replacing Aging Culvert for City of Covington

Fortis Siteworks is replacing aging drainage infrastructure at a City of Covington wastewater-treatment property off Flat Shoals Road, installing 48 feet of new 36-inch reinforced-concrete pipe and four headwalls where a failing culvert ran beneath an internal service road. A second phase repairs a sinkhole and eroded slopes near Dried Indian Creek with new fill, aggregate base and permanent erosion-control matting.

read more
Fortis Siteworks crew member spotting for a Komatsu excavator digging a water line trench beside an active highway, with orange barriers separating the work zone from traffic

Water-Line Relocation Clears Way for New SR 53 Roundabout

Fortis Siteworks is relocating more than 1,200 feet of water line for a new GDOT roundabout at SR 53 and Malcom Bridge Road in Oconee County, working as a subcontractor to E.R. Snell and using jack-and-bore crossings to avoid cutting the active roadway.

read more
Fortis Siteworks and D.R. Horton team members standing with ceremonial shovels at a groundbreaking, in front of a D.R. Horton banner hung between the arms of an excavator

Stillwater at Lake Oconee Marks Next Phase of Development

Fortis Siteworks delivered the sitework and wet-utility infrastructure for Stillwater at Lake Oconee, moving more than 500,000 cubic yards of earthwork and installing over 26,000 linear feet of storm, sewer, force main and water line for the Forestar community in Putnam County.

read more
Aerial view of an active Fortis Siteworks site with multiple excavators, loaders and haul trucks working across the pad, alongside utility structures, retaining walls under construction, and the project office and equipment staging area

Fortis Delivers Sitework for Good Samaritan Pavilion

Fortis Siteworks crews delivered grading and underground infrastructure within a limited footprint on the active St. Mary’s Good Samaritan Hospital campus, coordinating work around vertical construction, existing facilities and multiple contractors.

read more
Five Fortis Siteworks utility crew members standing inside a 10-foot-diameter fiberglass wet well before installation at the Veazey Connector

More Than 30 Years of Pump Station Experience at Fortis

Pump stations move wastewater where gravity can’t. Fortis Siteworks has built and rehabilitated hundreds of them across Georgia — work that demands deep excavation, structural, piping and electrical coordination, and the field experience to adapt when subsurface conditions change.

read more
Fortis Siteworks crew using excavators to set force main pipe along the side of a bridge over water, with a work barge and turbidity barrier in the water below

Richland Connector Utility Project Reaches 8-Mile Milestone

Fortis Siteworks has installed more than 42,000 linear feet of force main — nearly eight miles — in roughly two months on the Richland Connector project, building wastewater infrastructure to serve future development in the Reynolds Lake Oconee area.

read more
Aerial view of the Publix-anchored retail center and completed sitework at Lake Country Village

Publix-Anchored Retail Center Nears Completion at Lake Country Village

Fortis Siteworks is nearing completion of major sitework for the new Publix-anchored retail center at Lake Country Village in Putnam County. As the site contractor, Fortis delivered the earthwork, utilities, drainage, paving and roadway improvements needed to support the growing commercial development along the Lake Oconee Parkway corridor.

read more
Fortis Siteworks crew setting a precast drainage structure in an open trench alongside an active roadway on the SR 44 wet utilities project

Fortis Supports Wet Utility Relocations for SR 44 Widening Project

Fortis Siteworks is supporting the SR 44 widening project in Greene County by relocating critical water and sewer infrastructure ahead of roadway construction. Working under Pittman Construction, Fortis crews are currently relocating utilities for the City of Greensboro near I-20, with additional relocation work planned throughout the project corridor.

read more